Site Checklist

  • Site Address: QRX240 Russell St Toowoomba
  • Inspector Name: Johnny lett
  • Inspection Date: 27/02/2026
  • Site Contact on Day: Julia Martin

PATCH AND PAINT TASKS

  • Introduction to practice manager
  • Address any practice manager concerns
    • Discuss 5 am entry. I was given a key and the code to turn off the alarm.
  • Inspect exterior perimeter of practice where applicable
  • Inspect signage for damage
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
  • Check all doors for correct operation
  • Check all doorstops are functional
  • Inspect walls for damage
    • Repaint as many of the wear & tear marks on walls as we possibly can in the two day timeframe allocated for this practice
  • Check over joinery units for damage
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
  • Check all lights are functioning

PAINTED AREAS

Title Colour
Walls 180 m² Lexicon half
Ceilings
Doors
Trim 65 lineal metres Custom colour made on site to match existing frames

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

This practice had more work than the two days that we were allocated The four ultrasound rooms didn’t get painted because they were a different colour than the rest of the practice and couldn’t be touched up. No doors were done in this attendance as these are an off-white colour and realistically all need painting to assist modernise the practice. Actioned
Total: $0.00

PICTURES

Before

After

Comment

Have repainted marks on architrave only in original colour cream

Before

After

Comment

Repaint door frames where needed

Before

After

Comment

Repaint all walls and x-ray one and two

Before

After

Comment

Remove old COVID-19 floor stickers

Before

After

Comment

Remove old wall anchor fixings plaster and repaint in a number of areas and offices and control rooms

Before

After

Comment

Repaint all walls and corridors

Before

After

Comment

Re-plaster and repaint four large cracks above various door frames

Before

After

Comment

Repaint walls and offices and workstations

Before

After

Comment

Picture of one of 29 doors that were not done in this maintenance routine

Before

After

Comment

Repaint recovery room