Site Checklist
- Site Address: QX242 Highfields
- Inspector Name: Johnny lett
- Inspection Date: 05/03/2026
- Site Contact on Day: Julia Collins
PATCH AND PAINT TASKS
- Introduction to practice manager
- Address any practice manager concerns
-
Inspect exterior perimeter of practice where applicable
- Exterior woodwork and panelling needs painting, possibly landlord responsibility
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
-
Check all doorstops are functional
- Refix loose doorstop in unisex toilet
-
Inspect walls for damage
- Repaint all interior walls we are needed
- Check over joinery units for damage
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
- Check for damaged ceiling tiles
- Check all lights are functioning
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 120 square metres | Lexicon half |
| Ceilings | ||
| Doors | 4 doors | Lexicon half |
| Trim | 110 lineal metres | Lexicon half |
ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE
| Exterior of building could use some painting maintenance and I thought the cleaners inside could do a better job there’s lots of dust on skirtings and cobwebs up high | Actioned | |
| Total: | $0.00 |
Comment
Imperfections and dirty marks in corridors repaint all of them