Site Checklist

  • Site Address: QX191 Cooparoo
  • Inspector Name: Johnny lett
  • Inspection Date: 17/07/2026
  • Site Contact on Day: Alison Dow

PATCH AND PAINT TASKS

  • Introduction to practice manager
    • Due to early morning starts I was in and painting when I caught up with Alison this was all familiar as I do remember her from last time
  • Address any practice manager concerns
    • Alison was a bit concerned about both sides of staff door entrance in front of building deteriorating due to existing grey lacquer peeling off the original dark green powder coded aluminium We prepped the door and coated it in aerosol lacquer paint which looks night and day better than it did.
  • Inspect exterior perimeter of practice where applicable
  • Inspect signage for damage
    • Cleaned black marks off Queensland x-ray sign front door.
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
  • Check all doors for correct operation
  • Check all doorstops are functional
  • Inspect walls for damage
    • Repaint all walls where necessary in (lexicon half) repainted BMD room as well this room was a different colour (antique white )
  • Check over joinery units for damage
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
    • Replace old silicon in unisex toilets x2.
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
    • Replace two cut tiles in the ceiling due to wiring being rearranged in EOS room.
  • Check all lights are functioning

PAINTED AREAS

Title Colour
BMD walls 30 m² Antique white USA
Walls 150 m² Lexicon half
Ceilings
Doors Six doors Willie Wilson
Trim 60 lineal metres Lexicon half

CLEANLINESS RATING

Area Rating Comment
Floors good Dust behind things that do not get moved regularly i.e. behind furniture and under chairs.
Furniture and Fixtures good Light dust on legs of chairs top of picture frames etc.
High Level and Ceilings poor Cobwebs and lots of dust on air conditioning vents looks like the same as the year before.
External Areas good

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

Met Ron the cleaner there early one morning and talked about cobwebs etc. He says he has not been given enough time to achieve all the required cleaning. After talking to Alison Dow she is aware of the problem and has requested a cleaning, team to come in and do a spring clean maybe twice a year but has not succeeded. The practice would definitely benefit from thorough clean and a fresh set of eyes to identify areas others have become complacent with. Actioned
I was quite surprised on the general condition of this practice after repainting it a year ago most things are good i.e. toilet door handles tight ,doorstops still strong joinery all working fine . But the general condition of the painted walls ,doors and frames were quite worn obviously a very busy practice. Actioned
Wall Protection A total of 2 sheets were installed (7 pieces) and 7 Corner guards. Actioned
Total: $0.00

PICTURES

Before

After

Comment

Some examples of the cleaning not being done up high.

Before

After

Comment

Damage to external corners in all corridors, instead of plastering and repainting corner protection was fitted on 7 of these worst affected areas.

Before

After

Comment

Redo silicone on water damaged hand basin in toilets notice how dirty tap faucet was before we cleaned it.

Before

After

Comment

Repaint walls and column in centre x-ray workstation.

Before

After

Comment

Repaint all walls and lunchroom.

Before

After

Comment

Repaint both sides of exterior staff entrance door.

Before

After

Comment

Repaint six grey doors in various x-ray rooms.

Before

After

Comment

Repaint emergency exit door that leads to staircase.

Before

After

Comment

Repaint walls after wiring alteration in EOS room replace ceiling tiles as well.

Before

After

Comment

Line walls in laundry tub storage area with wall protection due to damage from trolleys.

Before

After

Comment

More wall protection fitted in x-ray room 2 this is one example of seven pieces installed in this practice.

Before

After

Comment

Repaint changing rooms due to light scuffing and dirty marks on walls 4 rooms in total.