Site Checklist

  • Site Address: 76 Willetts St, North Mackay, QLD, 4740
  • Inspector Name: Johnny Lett
  • Inspection Date: 26/09/2025
  • Site Contact on Day: Sarah Dunn

PATCH AND PAINT TASKS

  • Introduction to practice manager
    • Went into the practice on the Thursday to introduce ourselves to Sarah Dunn and discuss the scope of work and time frame but Sarah was on leave so spoke to the girl on reception
  • Address any practice manager concerns
    • There weren’t any specific concerns
  • Inspect exterior perimeter of practice where applicable
  • Inspect signage for damage
    • Five car park signs are showing weather deterioration and the main Queensland X Ray sign above the front main door has lost its colour
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
  • Check all doors for correct operation
  • Check all doorstops are functional
  • Inspect walls for damage
    • We found it very badly worn with lots of marks , holes and chipped corners where there is no corner protection
  • Check over joinery units for damage
    • Found one cupboard door in one of the ultra sound rooms was loose due to screws falling out, refitted using larger screws
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
    • Found water stained tiles and old holes where things have been removed but did not have time to replace any tiles in this scheduled maintenance
  • Check all lights are functioning
    • We found 2 of the dimmer knobs in the centre control room missing , trying to source the right sized knobs

PAINTED AREAS

Title Colour
Walls 450 Lexicon half
Door frames 180 lineal meters Lexicon half

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

Most of allocated time was spent plastering and painting on this practice as it was very worn. Didn’t replace water stained or damaged ceiling tiles as they weren’t that bad possibly nine tiles could be replaced next time in maintenance also would recommend wall protection in backdoor entrance linen room where trolleys are knocking gyprock also wall protection behind all rubbish bins as they are damaging the paint sometimes on the same day it was repaired and painted Actioned
Total: $0.00

PICTURES

Before

After

Comment

Back wall behind Reception very marked, prepped and repainted

Before

After

Comment

Door frame to CT Scan room very chipped as were 90% of frames through out the practice, prepped and repainted

Before

After

Comment

Back wall in staff smoko room very marked, prepped and repainted

Before

After

Comment

Damaged side wall in CT Prep room due to rubbish bins being pushed up against it, prepped, filled and repainted

Before

After

Comment

Four holes in wall in the centre control area, prepped, filled and repainted

Before

After

Comment

Damaged wall in Ultra sound 7 from equipment, prepped, filled then repainted

Before

After

Comment

Damaged wall in centre control room, prepped, filled and repainted

Before

After

Comment

Remove old silicon and replace tighten up loose faucet

Before

After

Comment

Repaint dirty marks behind waiting room seats

Before

After

Comment

Damaged wall edge in MRI room prepped and repainted

Before

After

Comment

Damaged wall edge in MRI room , prepped and repainted

Before

After

Comment

Plaster and repaint in laundry storage

Before

After

Comment

New screws fitted to top hinge

Before

After

Comment

Lots of damaged caused to walls in the linen room area from linen trolleys etc, prepped, filled and repainted

Before

After

Comment

Toilet door by Ultra sound 4 had hole in wall from having no doorstop , prepped, filled , repainted and installed new door stop

Before

After

Comment

Damaged wall in X Ray 2 , prepped ,filled and repainted

Before

After

Comment

Damaged wall also in X Ray 2, prepped, filled and repainted

Before

After

Comment

Fix down architrave fill and repaint

Before

After

Comment

Damaged door to CT room prepped and repainted

Before

After

Comment

Repaint door in toilet

Before

After

Comment

Damaged door and frame to Interview room, prepped and repainted

Before

After

Comment

Signs in car park showing weather deterioration main sign above front door lost all it’s colour

Before

After

Comment

Picture of five signs in car park

Before

After

Comment

Toilet door in Fluoroscopy room delaminating screwed glued and repainted