Site Checklist
- Site Address: QX689 Gold Coast Airport Central
- Inspector Name: Johnny lett
- Inspection Date: 20/01/2026
- Site Contact on Day: Emily Bell
PATCH AND PAINT TASKS
- Introduction to practice manager
-
Address any practice manager concerns
- Emily did have some concerns that needed some attention. These are all fixed while we were there.
- Inspect exterior perimeter of practice where applicable
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
-
Check all doorstops are functional
- One doorstop in office did need re-anchoring to the floor.
-
Inspect walls for damage
- Most of walls throughout practice needed repainting.
- Check over joinery units for damage
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
-
Check for damaged ceiling tiles
- Replace one dirty tile around air-conditioning vent in corridor.
- Check all lights are functioning
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 210 square metres | Half lexicon |
| Ceilings | ||
| Doors | ||
| Trim | 30 lineal metres | Half lexicon |
Comment
Plaster and repaint walls in ultrasound rooms