Site Checklist
- Site Address: QX163 Mater Redlands - Hospital site
- Inspector Name: Johnny lett
- Inspection Date: 23/03/2026
- Site Contact on Day: Bronwyn
PATCH AND PAINT TASKS
-
Introduction to practice manager
- Kristen Reeves not available that day a lady named Bronwyn gave me a key and took me over to show me where the room was on the Hospital site
- Address any practice manager concerns
- Inspect exterior perimeter of practice where applicable
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
- Check all doorstops are functional
-
Inspect walls for damage
- Re-plaster holes and repaint where necessary
- Check over joinery units for damage
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
- Check for damaged ceiling tiles
- Check all lights are functioning
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 20 square metres | Lexicon half |
| Ceilings | ||
| Doors | ||
| Trim |
ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE
| This was a very small two roomed practice that was in good condition | Actioned | |
| Total: | $0.00 |
Comment
Re plaster the hole and paint