Skip to content
Search for:
About Us
Our Services
Repairs & Maintenance
Project Management
Reno & Restorations
Retail & Office Fitouts
Projects
Testimonials
Get A Quote
0433 376 721
Shop 21A Building, 1 Duckworth St, Townsville
Home
/
Shop 21A Building, 1 Duckworth St, Townsville
Edit Site Checklist
Title
*
Site Address
Inspector Name
Inspection Date
Site Contact on Day
Patch and Paint Tasks
Tasks
Action
Task
Notes
1
Done
Note
1
Introduced ourselves and discussed the work plan
1
Add Note
2
Done
Note
1
We were asked if we could do as much work as possible out of hours to minimise disruption to clients
1
Add Note
3
Done
Note
1
Add Note
4
Done
Note
1
Add Note
5
Done
Note
1
Add Note
6
Done
Note
1
Add Note
7
Done
Note
1
Add Note
8
Done
Note
1
Add Note
9
Done
Note
1
Replaced 3 floor mounted door stops to Ultra Sound rooms 1 , 2 & 3
1
Add Note
10
Done
Note
1
There were a lot of scuffs, dents and some small holes in the walls
1
Add Note
11
Done
Note
1
Add Note
12
Done
Note
1
The water has been turned off in the vanity in the staff toilet, an out of order sign has been placed on it, requires a plumber
1
Add Note
13
Done
Note
1
Add Note
14
Done
Note
1
Silicone damaged in staff toilet under soap dispenser and hand towel unit, needs to be replaced
1
Add Note
15
Done
Note
1
Add Note
16
Done
Note
1
Multiple ceiling tiles & missing T bars need replaced
1
Add Note
17
Done
Note
1
Corridor lights showing slight yellowing, all work
1
Add Note
1
Done
Note
1
Add Note
Painted Areas
Title
M²
Colour
1
2
3
4
1
Add Item
Cleanliness Rating
Area
Rating
Comment
1
Poor
Good
Excellent
2
Poor
Good
Excellent
3
Poor
Good
Excellent
4
Poor
Good
Excellent
1
Poor
Good
Excellent
Add Item
Items That Could Improve Practice Appearance
Contractor Notes
Contractor Item Note
Cost
Completion
1
The big Queensland x-ray sign on front of building showing signs of sun fade could do with freshen up, Signage contractor required
Actioned
Required
2
A number of light fittings are starting to yellow, Electrician required
Actioned
Required
3
The hole in the coved skirting to ultrasound rooms remain, to cut back the vinyl patch the wall then re vinyl is considerable task. Would an acceptable solution be us getting a stainless steel cover plates made and sticking over the holes?
Actioned
Required
4
One Saturday was worked to get the busiest areas complete with minimal impact to operations.
Actioned
Required
1
Actioned
Required
Add Contractor Item Note
Photos
Before
After
Comments
1
Signage looks a bit dull
2
There are big bubbles in tiles
3
Door hardware adjusted
4
T bar needs replacing and tile re adjusted
5
Doors & frames need repainted
6
Vanity in staff toilet out of order
7
Silicone needs replacing in staff toilet below towel dispenser
8
Damage to doors
9
Damage to wall corners
10
Missing floor mounted door stops
1
Add Photo
Validate Email
Page load link
Go to Top