Site Checklist
- Site Address: QX165 Mater Womens
- Inspector Name: Johnny Lett
- Inspection Date: 13/11/2025
- Site Contact on Day: Kylie Lierich
PATCH AND PAINT TASKS
-
Introduction to practice manager
- Meet Kylie and discussed getting access in early morning
-
Address any practice manager concerns
- We were made aware of large holes caused by trolleys and an ultrasound machine wall protection was recommended for these areas
- Inspect exterior perimeter of practice where applicable
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
- Check all doorstops are functional
-
Inspect walls for damage
- All the usual scrap dents and marks a lot of repainting needed
- Check over joinery units for damage
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
-
Check for damaged ceiling tiles
- Three ceiling tiles were very dirty with marks. Will try and clean off if not replace.
- Check all lights are functioning
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 180 | Lexicon half |
| Ceilings | ||
| Doors | 4 | Lexicon half |
| Trim | 28 lineal metres | Lexicon half |
ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE
| We didn’t think the cleaning was as good as other practices, especially the dust on top of skirting boards | Actioned | |
| Total: | $0.00 |
Comment
Repaint all walls in reception waiting room