Site Checklist
- Site Address: QX 243 South Toowoomba
- Inspector Name: Johnny lett
- Inspection Date: 10/03/2026
- Site Contact on Day: Amy
PATCH AND PAINT TASKS
-
Introduction to practice manager
- Introduce ourselves to Amy day before work started made sure security pass worked for the early a.m. starts and she did show us a few concerned. She had i.e. ceiling tile stains which were replaced the next day.
- Address any practice manager concerns
- Inspect exterior perimeter of practice where applicable
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
- Check all doorstops are functional
- Inspect walls for damage
- Check over joinery units for damage
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
-
Check for damaged ceiling tiles
- Replace three discoloured water stain ceiling tiles
- Check all lights are functioning
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 200 square metres | Lexicon half |
| Ceilings | ||
| Doors | One door | Lexicon half |
| Trim | 15 lineal metres | Lexicon half |
PICTURES
Comment
Cut hole in CT ceiling tile to fit temporary air conditioning ducting. Leave new tile on site to replace once temporary ducting is removed
Comment
Repaint all walls in ultrasound rooms 1 2 3and 4