Site Checklist

  • Site Address: 189 Lake St, Cairns, QLD
  • Inspector Name: Johnny Lett
  • Inspection Date: 18/09/2025
  • Site Contact on Day: Amber

PATCH AND PAINT TASKS

  • Introduction to practice manager
    • Introduced ourselves to Amber the day before and discussed our scope of work and time frame, also asked if she had any concerns
  • Address any practice manager concerns
    • Amber had no major concerns except for 4 large holes in the wall above the cleaners sink in the cleaners cupboard
  • Inspect exterior perimeter of practice where applicable
  • Inspect signage for damage
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
  • Check all doors for correct operation
  • Check all doorstops are functional
    • 2 doorstops that were connected to the wall in 2 of the level 2 toilets had come loose
  • Inspect walls for damage
  • Check over joinery units for damage
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
    • There were a lot of water damaged and moldy ceiling tiles throughout the practice
  • Check all lights are functioning

PAINTED AREAS

Title Colour
Walls 50 Lexicon half
Door frames 45 lineal Meters Lexicon
Skirting boards 25 linear meters Lexicon

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

This practice is in good clean order internally possibly exterior of building and signage could do with power washing to remove black grime Actioned
Total: $0.00

PICTURES

Before

After

Comment

Ware & tear on skirting in corridor by offices, prepped & repainted

Before

After

Comment

Damage to staff office door on 2nd floor , prepped, filled and repainted

Before

After

Comment

Damage to door & frame in ultra sound room caused by trolley, prepped & repainted

Before

After

Comment

Damage to wall in CT room caused by bins, prepped, filled & repainted

Before

After

Comment

Loose door stop in toilet on 2nd floor, remounted it to door as was unable to fasten it back to wall

Before

After

Comment

Damage to wall behind door in EOS room, prepped, filled & repainted

Before

After

Comment

Remove and replace wet ceiling tiles in boardroom

Before

After

Comment

More wet tiles remove and replace boardroom

Before

After

Comment

Water damaged tile hallway remove and replace

Before

After

Comment

Before

After

Comment

4 holes in the cleaners/ linen room , prepped , filled & repainted