Edit Site Checklist
Title
*
Site Address
Inspector Name
Inspection Date
Site Contact on Day
Patch and Paint Tasks
Tasks
Action
Task
Notes
1
Done
Note
1
Introduced ourselves to Amber the day before and discussed our scope of work and time frame, also asked if she had any concerns
1
Add Note
2
Done
Note
1
Amber had no major concerns except for 4 large holes in the wall above the cleaners sink in the cleaners cupboard
1
Add Note
3
Done
Note
1
Add Note
4
Done
Note
1
Add Note
5
Done
Note
1
Add Note
6
Done
Note
1
Add Note
7
Done
Note
1
Add Note
8
Done
Note
1
Add Note
9
Done
Note
1
2 doorstops that were connected to the wall in 2 of the level 2 toilets had come loose
1
Add Note
10
Done
Note
1
Add Note
11
Done
Note
1
Add Note
12
Done
Note
1
Add Note
13
Done
Note
1
Add Note
14
Done
Note
1
Add Note
15
Done
Note
1
Add Note
16
Done
Note
1
There were a lot of water damaged and moldy ceiling tiles throughout the practice
1
Add Note
17
Done
Note
1
Add Note
1
Done
Note
1
Add Note
Painted Areas
Title
M²
Colour
1
2
3
4
1
Add Item
Cleanliness Rating
Area
Rating
Comment
1
Poor
Good
Excellent
2
Poor
Good
Excellent
3
Poor
Good
Excellent
4
Poor
Good
Excellent
1
Poor
Good
Excellent
Add Item
Items That Could Improve Practice Appearance
Contractor Notes
Contractor Item Note
Cost
Completion
1
This practice is in good clean order internally possibly exterior of building and signage could do with power washing to remove black grime
Actioned
Required
1
Actioned
Required
Add Contractor Item Note
Photos
Before
After
Comments
1
Ware & tear on skirting in corridor by offices, prepped & repainted
2
Damage to staff office door on 2nd floor , prepped, filled and repainted
3
Damage to door & frame in ultra sound room caused by trolley, prepped & repainted
4
Damage to wall in CT room caused by bins, prepped, filled & repainted
5
Loose door stop in toilet on 2nd floor, remounted it to door as was unable to fasten it back to wall
6
Damage to wall behind door in EOS room, prepped, filled & repainted
7
Remove and replace wet ceiling tiles in boardroom
8
More wet tiles remove and replace boardroom
9
Water damaged tile hallway remove and replace
10
11
4 holes in the cleaners/ linen room , prepped , filled & repainted
1
Add Photo