Site Checklist
- Site Address: 32 Raymond Terrace, South Brisbane
- Inspector Name: Johnny lett
- Inspection Date: 06/11/2025
- Site Contact on Day: Cassandra Perry
PATCH AND PAINT TASKS
- Introduction to practice manager
- Address any practice manager concerns
- Inspect exterior perimeter of practice where applicable
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
-
Check all doorstops are functional
- Unisex toilet need a doorstop
-
Inspect walls for damage
- The usual wear and tear on all walls doors and architraves
- Check over joinery units for damage
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
- Check for damaged ceiling tiles
- Check all lights are functioning
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 200 | Lexicon half |
| Ceilings | ||
| Doors | 12 xdoors | |
| Trim | 60 lineal metres |
ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE
| We have installed wall protection in ultrasounds rooms three and four and various corner mouldings in corridors where lots of damage was occurring. Also added a wooden shelf on top of half wall in recovery room that was being used as a shelf. | Actioned | |
| Total: | $0.00 |
PICTURES
Comment
More plastering and painting on corners where beds wheelchairs etc have collided
Comment
Scuff marks on walls prepare and paint. This is very typical of most walls in this practice.


Comment
Plaster and paint corners in corridor