QX112 Mater Public
Home
/
QX112 Mater Public
Edit Site Checklist
Title
*
Site Address
Inspector Name
Inspection Date
Site Contact on Day
Patch and Paint Tasks
Tasks
Action
Task
Notes
1
Done
Note
1
Add Note
2
Done
Note
1
Add Note
3
Done
Note
1
Add Note
4
Done
Note
1
Add Note
5
Done
Note
1
Add Note
6
Done
Note
1
Add Note
7
Done
Note
1
Add Note
8
Done
Note
1
Add Note
9
Done
Note
1
Unisex toilet need a doorstop
1
Add Note
10
Done
Note
1
The usual wear and tear on all walls doors and architraves
1
Add Note
11
Done
Note
1
Add Note
12
Done
Note
1
Add Note
13
Done
Note
1
Add Note
14
Done
Note
1
Add Note
15
Done
Note
1
Add Note
16
Done
Note
1
Add Note
17
Done
Note
1
Add Note
1
Done
Note
1
Add Note
Painted Areas
Title
M²
Colour
1
2
3
4
1
Add Item
Cleanliness Rating
Area
Rating
Comment
1
Poor
Good
Excellent
2
Poor
Good
Excellent
3
Poor
Good
Excellent
4
Poor
Good
Excellent
1
Poor
Good
Excellent
Add Item
Items That Could Improve Practice Appearance
Contractor Notes
Contractor Item Note
Cost
Completion
1
We have installed wall protection in ultrasounds rooms three and four and various corner mouldings in corridors where lots of damage was occurring. Also added a wooden shelf on top of half wall in recovery room that was being used as a shelf.
Actioned
Required
2
1 section of wall vinyl in the bed bays at the end of the back hallway requires replacement as it is torn at skirting level.
Actioned
Required
1
Actioned
Required
Add Contractor Item Note
Photos
Before
After
Comments
1
Plaster and paint corners in corridor
2
More plastering and painting on corners where beds wheelchairs etc have collided
3
Scuff marks on walls prepare and paint. This is very typical of most walls in this practice.
4
Repair damage to walls and repaint
5
Apply wall protection where needed and repair and repaint water
6
Install corner protection
7
Repaint numerous door frames
8
Repaint walls
9
Repaint walls
10
Repair and repaint walls
11
Install wooden shelf onto existing half wall
12
Install wall protection ultra sound room number 4
13
Existing wall protection in recovery rooms very marked due to beds bumping into it cleaned off marks using appropriate cleaner
14
Another example of marks on wall protection
15
Damaged wall vinyl to bed bays, recovery area. See contractor notes for pricing to rectify.
16
1
Add Photo