Site Checklist

  • Site Address: QX194 Bayside
  • Inspector Name: Johnny lett
  • Inspection Date: 15/04/2026
  • Site Contact on Day: Kirsten Reeves

PATCH AND PAINT TASKS

  • Introduction to practice manager
  • Address any practice manager concerns
    • Kirsten was a bit concerned about the laundry trolley coming in and out every day knocking the corridor corners so I suggested we put corner protection on six of those corners which she was happy with
  • Inspect exterior perimeter of practice where applicable
    • Exterior car parks all good Although the exterior white steel columns coming in the main pedestrian entrance the paint is all peeling off needs maintenance. Landlord?
  • Inspect signage for damage
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
  • Check all doors for correct operation
  • Check all doorstops are functional
    • Install one doorstop in unisex toilet and repair hole in wall.
  • Inspect walls for damage
    • Lots of damage repair and repaint.
  • Check over joinery units for damage
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
    • Replace sagging ceiling tile in CT X-ray room.
  • Check all lights are functioning

PAINTED AREAS

Title Colour
Walls 130 m² There are two colours in this practice lexicon half and antique white
Ceilings
Doors 15 m² Willie William
Trim 45 lineal metres Lexicon half

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

This practice is in very good condition we’re recent alterations have taken place but in the centre part ie two x-ray rooms , control rooms and corridor is the old colour (antique white). So I was told to paint to the matching existing colour as there are some more alterations happening there in the near future. Actioned
Total: $0.00

PICTURES

Before

After

Comment

Repaint walls in all stations

Before

After

Comment

Re-plaster and Repaint all walls in corridors and add corner protection were needed six in total

Before

After

Comment

Replaster holes and repaint area were laundry tubs are kept

Before

After

Comment

Repaint all walls in both x-ray rooms

Before

After

Comment

Repair and repaint area around back door

Before

After

Comment

Install new doorstop in unisex toilet

Before

After

Comment

Replace ceiling tile and install missing T bar around Aircon outlet

Before

After

Comment

Repaint doors where needed

Before

After

Comment

Install extra high corner protection in the corridors due to large laundry tubs damaging corners daily

Before

After

Comment

Example of the exterior columns that do need preparation and paint