Site Checklist

  • Site Address: 318 Mulgrave Road, Cairns QLD 4870
  • Inspector Name: Johnny lett
  • Inspection Date: 17/09/2025
  • Site Contact on Day: Steven Saul 0740528401

PATCH AND PAINT TASKS

  • Introduction to practice manager
    • Went to the practice and introduced ourselves to Steven and explained our scope of work and time frame
  • Address any practice manager concerns
    • Stephen did request us to hang various pictures, fire documentation holders pin boards etc on walls which was done
  • Inspect exterior perimeter of practice where applicable
  • Inspect signage for damage
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
  • Check all doors for correct operation
  • Check all doorstops are functional
    • Doorstop was missing in Ultra sound room 1, which had caused damage to the wall, installed new door stop
  • Inspect walls for damage
    • Usual wear and tear to walls with scuffs and dents from chairs and trolleys etc
  • Check over joinery units for damage
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
    • There were a few moldy ceiling tiles in the Tomography room and one in the connecting corridor, replaced tiles with existing new tiles found in cupboard
  • Check all lights are functioning

PAINTED AREAS

Title Colour
Walls 200 Lexicon half
Doors and frames 50 lineal metres Custom-made dark grey
Skirting boards 125 lineal meters Lexicon half

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

Three days maintenance work was done in this xray practice didn’t leave much time for CT scanning practice next door, realistically 2 additional days could be spent in the adjoining tenancy. Actioned
Total: $0.00

PICTURES

Before

After

Comment

Silicon in toilet peeling, replaced and painted

Before

After

Comment

Small hole in wall inside automatic doors from waiting room, filled hole , sanded and repainted

Before

After

Comment

Door to toilet chipped , prepped and repainted, we have found this is typical on most toilet doors in the different practices

Before

After

Comment

Chipped frame edge in staff office area, prepped and repainted

Before

After

Comment

Holes in wall in Bone Density room , filled, sanded and repainted

Before

After

Comment

Shipped wall edge in Topography room control room

Before

After

Comment

Missing door stop in Ultrasound room 1, installed new door stop

Before

After

Comment

Chipped wall in X Ray room, prepped and repainted

Before

After

Comment

Chipped door frame in office area , prepped and repainted

Before

After

Comment

Damage to X Ray room wall by wooden step, prepped and repainted

Before

After

Comment

Back exit door quite badly marked , prepped and repainted

Before

After

Comment

Mark from sanitary unit in toilet, prepped and repainted

Before

After

Comment

Stained ceiling tiles in corridor and topography room. Six tiles used from tile stock found in cupboard

Before

After

Comment