QX102 Sunnybank Private Hospital
Home
/
QX102 Sunnybank Private Hospital
Edit Site Checklist
Title
*
Site Address
Inspector Name
Inspection Date
Site Contact on Day
Patch and Paint Tasks
Tasks
Action
Task
Notes
1
Done
Note
1
Add Note
2
Done
Note
1
Deidre and I did discuss where wall protection needs to be installed to prevent ongoing damage
1
Add Note
3
Done
Note
1
Add Note
4
Done
Note
1
Add Note
5
Done
Note
1
Add Note
6
Done
Note
1
Add Note
7
Done
Note
1
Add Note
8
Done
Note
1
Lubricate and tighten toilet door handle opposite x-ray 1
1
Add Note
9
Done
Note
1
Add Note
10
Done
Note
1
Repaint all walls where necessary due to wear and tear Repaint common area in corridor as well this was a different colour than the practice i.e. antique white
1
Add Note
11
Done
Note
1
Add Note
12
Done
Note
1
Add Note
13
Done
Note
1
Add Note
14
Done
Note
1
Replaced mouldy silicon in two toilets vanity basins outside x-ray 1 and 3
1
Add Note
15
Done
Note
1
Add Note
16
Done
Note
1
Add Note
17
Done
Note
1
Lights need replacing in ultrasound waiting room and OPG room due to yellowing 4 in total
1
Add Note
1
Done
Note
1
Add Note
Painted Areas
Title
M²
Colour
1
2
3
4
5
1
Add Item
Cleanliness Rating
Area
Rating
Comment
1
Poor
Good
Excellent
2
Poor
Good
Excellent
3
Poor
Good
Excellent
4
Poor
Good
Excellent
Queensland X-ray signage in excellent condition landscapers currently putting red bark in gardens. Every thing looks very neat and tidy.
1
Poor
Good
Excellent
Add Item
Items That Could Improve Practice Appearance
Contractor Notes
Contractor Item Note
Cost
Completion
1
Water damage wooden windowsill in ultrasound room two and three all swollen with moisture damage. Whilst the external windows remain leaking there is not much point replacing the timber, unless we were replace it with a piece of stone that wouldn't be affected by water. Please advise if this preferred. Ultimately its a Body Corp issue as its a external window.
Actioned
Required
2
4 yellowing lights need replacing in OPG and ultrasound
Actioned
Required
3
Install of 4 pieces of wall protection (2 sheets)
Actioned
Required
1
Actioned
Required
Add Contractor Item Note
Photos
Before
After
Comments
1
Yellowing lights in ultrasound and OPG Second photo swollen windowsill in ultrasound rooms 2 and 3
2
Replace silicon on vanity in two toilets
3
Repair aluminium signage trim and repaint behind reception
4
Repaint all changing rooms
5
Repaint seven doors and frames
6
Plaster and paint in common areas throughout practice
7
Install corner protection in three areas in corridor
8
This is one area of the four panels of wall protection that we installed in this practice.
9
Repaint waiting room and remove old COVID-19 stickers off the floor
10
Plaster walls in waiting room and repaint
1
Add Photo
Validate Email