Site Checklist
- Site Address: QR890 Administration
- Inspector Name: Johnny lett
- Inspection Date: 27/01/2026
- Site Contact on Day: John Scott
PATCH AND PAINT TASKS
- Introduction to practice manager
-
Address any practice manager concerns
- Was shown water damage ceilings that requires some attention
- Inspect exterior perimeter of practice where applicable
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
-
Check all doorstops are functional
- Add two new doorstops to level three women’s toilet
-
Inspect walls for damage
- Repaint walls where needed
-
Check over joinery units for damage
- Cupboard door edging lifting due to heat from coffee machine on level three lunchroom This was glued back down
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
-
Check for damaged ceiling tiles
- There were six ceiling tiles that were replaced due to water staining
-
Check all lights are functioning
- Two bulbs replaced in level three lunchroom
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 225 square metres | Quarter lexicon |
| Ceilings | 46 square metre | Dulux white on white |
| Doors | 9 doors | Domino |
| Trim |
PICTURES
Comment
Re-plaster and paint walls in level three ladies toilet due to no doorstops. Install two new doorstops.
Comment
Cupboard edging has become unstuck through steam rising from coffee machine re-glue back down
Comment
Repaint half lexicon coloured walls throughout levels 1. 2. and 3