QR890 Adiminstration
Home
/
QR890 Adiminstration
Edit Site Checklist
Title
*
Site Address
Inspector Name
Inspection Date
Site Contact on Day
Patch and Paint Tasks
Tasks
Action
Task
Notes
1
Done
Note
1
Add Note
2
Done
Note
1
Was shown water damage ceilings that requires some attention
1
Add Note
3
Done
Note
1
Add Note
4
Done
Note
1
Add Note
5
Done
Note
1
Add Note
6
Done
Note
1
Add Note
7
Done
Note
1
Add Note
8
Done
Note
1
Add Note
9
Done
Note
1
Add two new doorstops to level three women’s toilet
1
Add Note
10
Done
Note
1
Repaint walls where needed
1
Add Note
11
Done
Note
1
Cupboard door edging lifting due to heat from coffee machine on level three lunchroom This was glued back down
1
Add Note
12
Done
Note
1
Add Note
13
Done
Note
1
Add Note
14
Done
Note
1
Add Note
15
Done
Note
1
Add Note
16
Done
Note
1
There were six ceiling tiles that were replaced due to water staining
1
Add Note
17
Done
Note
1
Two bulbs replaced in level three lunchroom
1
Add Note
1
Done
Note
1
Add Note
Painted Areas
Title
M²
Colour
1
2
3
4
1
Add Item
Cleanliness Rating
Area
Rating
Comment
1
Poor
Good
Excellent
2
Poor
Good
Excellent
3
Poor
Good
Excellent
4
Poor
Good
Excellent
1
Poor
Good
Excellent
Add Item
Items That Could Improve Practice Appearance
Contractor Notes
Contractor Item Note
Cost
Completion
1
Actioned
Required
Add Contractor Item Note
Photos
Before
After
Comments
1
Repaint half lexicon coloured walls throughout levels 1. 2. and 3
2
Repaint grid coloured walls everywhere on level two
3
Repaint damaged domino coloured wall on level two
4
Water stain ceiling above window east side level two
5
Water stain ceiling tiles six were replaced on level three
6
Re-plaster and paint walls in level three ladies toilet due to no doorstops. Install two new doorstops.
7
Replace two new lightbulbs in lunchroom level three
8
Cupboard edging has become unstuck through steam rising from coffee machine re-glue back down
9
Paint out black marks on ceilings in admin boardroom level one
10
Plaster and repaint ground level ceiling in lift foyer due to water condensation from air conditioning above
1