Skip to content
Search for:
About Us
Our Services
Repairs & Maintenance
Project Management
Reno & Restorations
Retail & Office Fitouts
Projects
Testimonials
Get A Quote
0433 376 721
301 vulture Street South Brisbane
Home
/
301 vulture Street South Brisbane
Edit Site Checklist
Title
*
Site Address
Inspector Name
Inspection Date
Site Contact on Day
Patch and Paint Tasks
Tasks
Action
Task
Notes
1
Done
Note
1
Add Note
2
Done
Note
1
Hang pictures on the wall in Doctors’s office as requested
1
Add Note
3
Done
Note
1
Add Note
4
Done
Note
1
Add Note
5
Done
Note
1
Add Note
6
Done
Note
1
Add Note
7
Done
Note
1
Six carpet tiles needed re-glueing down in reception waiting room, seat kickboard
1
Add Note
8
Done
Note
1
Add Note
9
Done
Note
1
Add Note
10
Done
Note
1
Lots of damage to walls, dents scrapes peeling paint.
2
Main corridor heavily damaged complete repaint.
3
Additional wall/corner protection in some areas would be beneficial.
4
Wall protection to hallway needs cleaning with solvents.
1
Add Note
11
Done
Note
1
Add Note
12
Done
Note
1
Add Note
13
Done
Note
1
Add Note
14
Done
Note
1
Multiple basins will be re siliconed as starting to go mouldy
1
Add Note
15
Done
Note
1
Add Note
16
Done
Note
1
Add Note
17
Done
Note
1
Add Note
1
Done
Note
1
Add Note
Painted Areas
Title
M²
Colour
1
2
3
4
1
Add Item
Cleanliness Rating
Area
Rating
Comment
1
Poor
Good
Excellent
2
Poor
Good
Excellent
3
Poor
Good
Excellent
4
Poor
Good
Excellent
1
Poor
Good
Excellent
Add Item
Items That Could Improve Practice Appearance
Contractor Notes
Contractor Item Note
Cost
Completion
1
Could have done a lot more in the practice plastering and painting took up most of the week need more time to do a thorough job, no ceilings or doors were repainted in this attendance. No works completed in Nuc Med
Actioned
Required
2
Lots of high level dust around air-conditioning vents on walls etc due to lack of cleaning
Actioned
Required
3
Additional wall protection required, linen trolley store in control room 960x960 to cover hole above coved vinyl + corner guards
Actioned
Required
1
Actioned
Required
Add Contractor Item Note
Photos
Before
After
Comments
1
1 of 6 carpet tiles to be re adhered
2
Change room basin marked out of order, staff un aware of why.
3
Damage to skirtings
4
Hole from linen trolley, wall protection required
5
Wall damage
6
Wall damage
7
Wall damage
8
Reception ceiling damage, didn't get time to do any ceilings
9
Reception ceiling damage, didn't get time to do any ceilings
10
Wall damage
1
Add Photo
Validate Email
Page load link
Go to Top