- Site Address: QX 183 Logan Road
- Inspector Name: Johnny lett
- Inspection Date: 09/12/2025
- Site Contact on Day: Kylie Woodall
PATCH AND PAINT TASKS
-
Introduction to practice manager
- Introduced ourselves and said we were painting today she was surprised did not know we were starting today
-
Address any practice manager concerns
- Was showing damage to walls caused by stainless steel trolley and rubbish bins so we suggested wall protection to be applied to these areas. Actioned
- Inspect exterior perimeter of practice where applicable
- Inspect signage for damage
- Inspect any allocated car parks
- Check for fire system that may require isolation
- Check floor coverings for damage
- Check all doors for correct operation
-
Check all doorstops are functional
- Fit A doorstop too architrave were laundry trolley is parked daily to prevent further damage
-
Inspect walls for damage
- Repaint most of walls due stuff marks and dents
- Check over joinery units for damage
- Check inside each cabinet for water leaks
- Check splash backs for water damage
- Check all silicone to splash backs, basins, sinks
- Check soap and hand towel dispenser condition
-
Check for damaged ceiling tiles
- One ceiling tile in the lunchroom needed replacing it has a hole in it.
- Check all lights are functioning
PAINTED AREAS
| Title | M² | Colour |
|---|---|---|
| Walls | 120 | Lexicon half |
| Ceilings | ||
| Doors | 4x doors | Willie Williams |
| Trim | 50 lineal metres | Lexicon half |
PICTURES
Comment
Lunchroom walls damage by rubbish bin movements apply protection & repaint all walls
Comment
More examples of applying more wall protection behind Rubbish bins this was repeated in seven areas in this practice
Comment
Repaint doors on unisex toilet x2