Site Checklist

  • Site Address: QX688 Gold Coast Private Hospital
  • Inspector Name: Johnny lett
  • Inspection Date: 12/01/2026
  • Site Contact on Day: Kylie pitcher

PATCH AND PAINT TASKS

  • Introduction to practice manager
  • Address any practice manager concerns
    • Rearrange shelving and picture frames at central room workstation
  • Inspect exterior perimeter of practice where applicable
  • Inspect signage for damage
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
    • Remove dirty tape from vinyl floor
  • Check all doors for correct operation
    • CT1 doors has major delamination problems as per photos show
  • Check all doorstops are functional
  • Inspect walls for damage
    • Repaint walls
  • Check over joinery units for damage
    • Storage cupboards behind reception need offside maintenance IE re-glueing and replacing of peeling ABS edge strips
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
  • Check all lights are functioning
    • 4 missing dimming knobswitch Have ordered but not on site yet, will call back to fit when they arrive

PAINTED AREAS

Title Colour
Walls 430 square metres Customise off-white colour made on site
Ceilings
Doors 8 doors Customise made colour
Trim 60 lineal metres Customise made colour

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

CT room doors require replacement as they are both damaged beyond repair and have bubbled laminate to the face. Separate quote to be provided. Actioned
Total: $0.00

PICTURES

Before

After

Comment

Repair and repaint corners in CT one room

Before

After

Comment

Install corner protection CT1 room

Before

After

Comment

Repaint walls in CT2 room

Before

After

Comment

Repair and repaint ultrasound rooms one two & three

Before

After

Comment

Repaint all grey coloured door frames

Before

After

Comment

Repaint eight off-white coloured doors and frames throughout the corridors

Before

After

Comment

Re-plaster and repaint reception walls

Before

After

Comment

Plaster and repaint rooms in PET

Before

After

Comment

Remove dirty old tape off floor and clean

Before

After

Comment

Dirty marks on walls everywhere. Repaint.

Before

After

Comment

Veneer doors in CT one both sets of twin doors are delaminating and need replacing.

Before

After

Comment

2x large sliders to X ray rooms needed stainless steel nose cap to be made and installed to avoid further damage.

Before

After

Comment

Skirting board in reception by sliding door needs replacing due to constant scraping by automatic door. Skirting was replaced with 1mm flat version so scraping no longer occurs.

Before

After

Comment

Joinery doors behind reception had missing or dislodged edge strip casing them not to operate correctly, all rectified.

Before

After

Comment

2x symmetrical pin boards installed in admin area behind reception

Before

After

Comment

2x Aluminum stops installed doors to cover and protect chipped edges from beds.