Site Checklist

  • Site Address: QX113 Logan home
  • Inspector Name: Johnny lett
  • Inspection Date: 22/07/2026
  • Site Contact on Day: Jill

PATCH AND PAINT TASKS

  • Introduction to practice manager
  • Address any practice manager concerns
    • Jill mentioned she would like the COVID-19 stickers removed from reception floor which was done
  • Inspect exterior perimeter of practice where applicable
    • The perimeter of the building in very nice order has been pressure washed recently. considerably better in appearance than last year
  • Inspect signage for damage
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
    • Remove COVID-19 stickers and other tape
  • Check all doors for correct operation
    • Refix deadbolt to architrave in ultrasound room two
  • Check all doorstops are functional
  • Inspect walls for damage
    • Plaster and repaint walls where necessary
  • Check over joinery units for damage
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
  • Check all lights are functioning

PAINTED AREAS

Title Colour
Walls 120 m² Lexicon half
Ceilings
Doors Six doors Customise grey to match
Trim 25 lineal metres Lexicon half

CLEANLINESS RATING

Area Rating Comment
Floors good
Furniture and Fixtures good
High Level and Ceilings good I noticed a few cobwebs high in waiting room ceiling which we removed with extension roller pole
External Areas good

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

Remove three very old cans of paint found in cupboard one oil base disposed of them at recycle Centre Nill Actioned
Total: $0.00

PICTURES

Before

After

Comment

Repaint walls behind reception

Before

After

Comment

Repaint walls where necessary in waiting room and remove all stickers off floor

Before

After

Comment

Changing room walls were not in bad order but needed painting just the same 4 in total

Before

After

Comment

Repaint six grey doors showing signs of damage

Before

After

Comment

Repaint walls and skirtings where needed

Before

After

Comment

Repaint white door frames where are needed

Before

After

Comment

Re-screw top of deadbolt latch