PATCH AND PAINT TASKS

  • Introduction to practice manager
  • Address any practice manager concerns
    • Teniesha the practice manager showed us some ceiling tiles in lunchroom and above bed and recovery room that she hoped to get replaced as they were very dirty and stained.
  • Inspect exterior perimeter of practice where applicable
  • Inspect signage for damage
  • Inspect any allocated car parks
  • Check for fire system that may require isolation
  • Check floor coverings for damage
  • Check all doors for correct operation
  • Check all doorstops are functional
    • Doorstop required in MRI
  • Inspect walls for damage
    • Repaint most of the walls
  • Check over joinery units for damage
  • Check inside each cabinet for water leaks
  • Check splash backs for water damage
  • Check all silicone to splash backs, basins, sinks
  • Check soap and hand towel dispenser condition
  • Check for damaged ceiling tiles
    • Replace ceiling tiles due to it having stains on them
  • Check all lights are functioning
    • Lights in corridor ceiling yellowing

PAINTED AREAS

Title Colour
Walls 220 Lexicon half
Ceilings Replace multiple ceiling tiles
Doors 3x doors Lexicon half
Trim 80 lineal metres Lexicon half

ITEMS THAT COULD IMPROVE PRACTICE APPEARANCE

Although work was done down in PET x-ray and most water damaged areas were repaired. No work was done in reception area as water leak is still under investigation we were told by staff on site. Actioned
Yellowed LED lights require replacement. We are happy to replace these as they are a plug in item, Is there a current light specification Make and Model that is preferred? Actioned
Total: $0.00

PICTURES

Before

After

Comment

Replace dirty ceiling tiles around A/C

Before

After

Comment

Replace ceiling tiles in lunchroom

Before

After

Comment

Apply wall protection were large laundry tub has damaged walls

Before

After

Comment

Apply more wall protection in bone density room & repaint

Before

After

Comment

Remove old COVID-19 signage on floor

Before

After

Comment

Re-plaster and paint walls everywhere

Before

After

Comment

ceiling tiles that were missing

Before

After

Comment

Repaint door frames due to chipping

Before

After

Comment

Yellowing lights in corridors. photo also shows more replaced ceiling tiles

Before

After

Comment

Repaint column in reception ready waiting room

Before

After

Comment

Walls in PET x-ray damaged by moisture rake out loose plaster, replaster and paint

Before

After

Comment

More moisture damage in pet x-ray remove loose plaster repair and repaint

Before

After

Comment

This is area in reception under desk where water is coming in ?? which is still under investigation. Did not repair or repaint this area.